Metro Rio, Brazil

Metro Rio, Brazil

Relay Panel Refurbishment

The existing door and general relay panels contained ageing relays, sockets, connections and terminal components that were approaching the end of their operational life. The number of relay malfunctions was increasing, while modifications made during the service life of the trains had resulted in relay contact loads that were no longer optimal. The existing configuration also offered limited spare capacity for future modifications.

A modern replacement therefore had to improve reliability and safety without requiring major changes to the trains. The replacement solution needed to fit within the available installation space, use the existing mechanical mounting points and remain compatible with the train wiring and connection locations. During the engineering phase, several panel concepts were evaluated to demonstrate compliance with these space constraints. Obsolete functionality had to be removed, while new functionality and spare positions had to be incorporated.

The Installation

Mors Smitt developed a complete retrofit solution covering investigation, engineering, prototype production, testing, installation and commissioning. Several panel concepts using the existing mechanical mounting points were developed and evaluated, helping to demonstrate that the required relay functionality could be accommodated within the available space while simplifying installation.

Relays with integrated LED indicators were installed and grouped according to voltage. Two smaller panels were incorporated into the general panel, creating a more consolidated arrangement. Separate diodes and RC circuits were installed in dedicated Mors Smitt housings. Updated circuit diagrams documented the revised relay connections.

The prototype panels underwent visual inspection, functional testing and shock and vibration testing according to IEC 61373. Installation and commissioning were performed in cooperation with the customer. The intended project process also included two prototype trains followed by a three-month operational trial before the release of serial production. The resulting configuration provides renewed relay panels with updated functionality, improved component organisation and an increased safety level of SIL2.

Operator

Metro Rio – Brazil

Unique Features

Relays feature integrated LED indicators

Panels retain existing mechanical mountings

Smaller panels integrated into general panel

Scope of Project DMRC
Project scopeRetrofit of door and general relay panels
Panel types modernisedDoor panel and general panel
Panels consolidated2 smaller panels integrated into general panel
Relay technologyRelays with integrated LED indicators
Safety levelSIL2
Mechanical integrationExisting mounting points retained
Railway qualificationShock and vibration testing according to IEC 61373
Project activitiesDesign, testing, installation and commissioning
Copyright©2026  Wabtec Netherlands BV •
Terms & Conditions • Privacy Statement • Cookie Policy • Corporate Information / Legal Notice

Welcome to the New Mors Smitt Website

We are excited to welcome you to our completely redesigned online experience. Our new website makes it easier than ever to explore our products, solutions, and expertise.

Alongside a modern, user-friendly design, we have introduced enhanced product navigation, new digital features, and a refreshed datasheet experience to improve readability, consistency, and ease of use.

Discover what's new